<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
  <channel>
    <title>Prefabridge · Blog</title>
    <link>https://prefabridge.com/en/blog</link>
    <description>Articles on the Spanish building code, technical assessment, and industrialized construction from international manufacturers.</description>
    <language>en</language>
    <atom:link href="https://prefabridge.com/en/blog/rss.xml" rel="self" type="application/rss+xml"/>
    <lastBuildDate>Mon, 16 Nov 2026 12:00:00 GMT</lastBuildDate>
    <item>
      <title>101 George Street, Croydon: a build-to-rent modular tower finished in 26 months</title>
      <link>https://prefabridge.com/en/blog/ten-degrees-croydon</link>
      <guid isPermaLink="true">https://prefabridge.com/en/blog/ten-degrees-croydon</guid>
      <pubDate>Mon, 16 Nov 2026 12:00:00 GMT</pubDate>
      <description>546 rental homes in Croydon, in 44- and 38-storey towers, built from factory modules on a 26-month programme.</description>
    </item>
    <item>
      <title>AEDAS Homes and industrialised housing</title>
      <link>https://prefabridge.com/en/blog/aedas-homes-industrialised-housing</link>
      <guid isPermaLink="true">https://prefabridge.com/en/blog/aedas-homes-industrialised-housing</guid>
      <pubDate>Sun, 15 Nov 2026 12:00:00 GMT</pubDate>
      <description>What AEDAS Homes has reported about La Maquia and the 3,193 industrialised homes in its 2024-25 financial year.</description>
    </item>
    <item>
      <title>Spain’s housing shortage: why homes are missing, and what factory building can add</title>
      <link>https://prefabridge.com/en/blog/spain-housing-shortfall</link>
      <guid isPermaLink="true">https://prefabridge.com/en/blog/spain-housing-shortfall</guid>
      <pubDate>Sat, 14 Nov 2026 12:00:00 GMT</pubDate>
      <description>The Bank of Spain puts the cumulative housing shortfall from 2021 to 2025 at about 750,000 homes. What that figure measures.</description>
    </item>
  </channel>
</rss>
